Ambitious Trans-Arunachal Highway progress slow

By Pradeep Kumar

TISSA | Mar 26 | Apprehensive of a tedious journey along 31-km Khonsa-Longding dilapidated road, locals cautioned to be very careful for it will take two-hour, but many a surprises were waiting in the lurk.

This stretch is part of 1,840-km ambitious double-lane Trans-Arunachal Highway worth costing Rs. 5,500 crore gifted by then prime minister Manmohan Singh on 31.01.08 to provide inter-district connectivity by linking 13 district HQs to speed up socio-economic development  process of this land-locked state.

Beginning from Tawang to Kanubari in Khnosa, the TAH length was increased later to about 2,192-km for linking few left out district HQs. Major portion of Khonsa-Longding road has been widened, gravels laid and leveled while few kilometers completely blacktopped. Most portion of 47-km Deomali-Khonsa stretch has been blacktopped while 46-km Longding-Kanubari portion is completely in dilapidated condition and the TAH work is yet to start.

When asked why the progress has been slow though the work started about five years ago by         M/s JKM Infra Projects Ltd, some locals said while working season is only about three months but many a ‘ifs’ and ‘buts’ cause avoidable delay.

The nature was in full bloom in this temperate zone of Siwalik range with greenery all over while flowers, multi-colour leaves & orchids waiving in air and chirping birds flying from one branch to another, justifying Arunahchal Pradesh as one of the 12 bio-diversity hotspots of the world.

Though expert driver H P Biswas, CEO of this daily, was on the wheel, it was a sheer coincidence, Longding UD & housing deputy director Bapenlu Kri walking on the road, on enquiry, said the construction once complete would herald a new era of multi-faceted development for the simpleton peace-loving people. The agri-horticulture products would find forward market linkage giving boost to the rural economy.

She is absolutely right as communication is key to development. That is why Chief Minister Pema Khandu had told the state Assembly recently that his Govt has given top priority to road development to provide speedy communication.

The day had begun for the hard working locals who carrying their essentials on dangsa (bamboo basket) were almost on double march on their time-tested vehicle (ARC-11), which stops only after the walker gets tired.

Heavy excavators, road rollers, cranes and tippers were seen at few depots while three culverts were already complete. Truck, sumos, cars and bikes were crossing intermittently. A local here said that a lone state transport bus travels from Khonsa to Khanu, located along Myanmar border. Good number of shops and hotels have been set up at this tri-junction of Khonsa-Waka-Longding to cater to the need of floating population as the village has hardly about 500 population.

As I crossed the bridge over Tisa river here, I was reminded of journalist-turned lawmaker Gabriel D Wangsu’s remarkable documentary Triumph over Tisa. The river flowing from Myanmar border to Assam has been life givers since ages to about 1,000 paan (betel leaf) growers. The cultivators pack the leaves & transport it through hand-made ordinary bamboo rafts while sustaining on catching fish from Tisa and resting for a while mid-way, before reaching the market in Assam to sell and procure essential commodities  to return home walking for lack of road. Tisa is live-giver like other two important rivers Tissing and Tewai, which record the testimony of Wanchos’ struggle for survival. History has it that all civilizations flourished along or on the banks of rivers all over the world.

Related posts