By Pradeep Kumar
ITANAGAR | Mar 06 | It may be recalled that Union Finance Minister Arun Jaitely had announced construction of a tunnel to bypass in 2018 Budget that had miffed China to threaten to respond through “economic means”.
The tunneling project bypassing Sela Pass to bring Tawang closer and make the journey less strenuous had brightened with National Hydroelectric Power Corporation Ltd (NHPC) conducting a techno-economic feasibility study and satellite survey. The NHPC will build the tunnel as part of 600-MW Kameng HE Project and 1120-MW Kameng-I HE Project being executed by it in the Kameng basin. This tunneling will also help the Indian Army deployed along the frontier and the tourist flow. Arunachal shares 1,080-km border with China.
The tunnel will reduce Tawang distance of 287-km from Bhalukpong by around 60-km and provide a smooth ride on an all-weather road. It was then chief minister Dorjee Khandu who had mooted the ambitious plan and asked the NHPC to take up the project to overcome the communication difficulties.
Sela Pass, located 13,700 feet above e sea level, though a beautiful tourist spot, remains snow-bound during winter and becomes a major hurdle for commuters not accustomed to such heights where often breathing becomes difficult due to low oxygen level.
Once the tunnel is completed, targeted in three to four years, and double-lanning of Bhalukpong-Tawang road, Tawang, located at 10,200 feet above sea level on Sino-India border and abode of 400-year-old Buddhist monastery, besides Snowy Shiva Linga (Arunnath) which surfaces at Sella Pass in every winter will attract many more tourists from far and wide than ever before.
When Tourism Minister Jarkar Gamlin took note when his attention was drawn today towards Arunnath, like Amarnath, Snowy Shiva Linga formed naturally in a cave to help J-K Govt to mint money from tourists, why not the GoAP?
