Cap: Arunank team led by CE Tripathy inspecting tough hill cutting in Tama Chung Chung sector
By Pradeep Kumar
ITANAGAR | Apr 03 | Border Roads Organisation (BRO) Director General Lt Gen S K Shrivastava is expected to assess ground situation of ongoing works in Arunachal Pradesh during a three-day trip from April 10 next.
This bodes well with the central Govt policy of prioritizing NE development as Union MoS (Railways) Manoj Sinha on Saturday last had launched final location surveys of three projects to expand broad gauge rail line to border areas of this state including Tawang. This reflected the Railway Ministry’s commitment to expand railway network in this sensitive border state.
Srivastava will arrive at Naharlagun and hold a discussion with Arunanak engineers led by CE B R Tripathy before proceeding to physically inspect ongoing works in most difficult terrains, like Tama Chung Chung-Taksing-Majha in Upper Subansiri district and Sarli-Huri in Krung Kumey district along Indo-Sino border.
These roads are of high strategic importance as completion of these roads would facilitate easy movement of defence forces to international borders.
Moreover, Shrivastava is likely to call on Chief Minister Pema Khandu in state capital here to apprise him of the status of ongoing works, constraints confronting the BRO in executing works, like inordinate delay in land acquisition.
It may be mentioned here that the BRO has been given about 268 roads spanning 5,385-km roads along the border areas and 30 roads with a length of 1,835-km will provide direct link to Indo-China border areas, highly placed sources told this editor.
While approximately 4,400-km roads are under construction, 6,425-km roads are under maintenance as the annual rains for six to seven months continue to damage the roads.
Many factors were responsible for progress of works, including fund allocation, air transportation of materials to difficult areas and adequate manpower.
As inordinate delay in land actuation hindered the commencement of Banderdewa-Hollongi four-lane highway, the fate of all BRO roads were meeting with the same fate.
That was why Union MoS (Home) Kiren Rijiju had exhorted the state people on Saturday last to extend their wholehearted support in land acquisition and not to create any hurdle in any developmental works or else development would never be possible in the state.
Interestingly, New Delhi mandarins are no way less development barrier as was highlighted on 03.08.12 by this editor – Private agency to build border roads, Arunank halts major works, BRO lays off 1,000 workers: “The BRO, entrusted with the responsibility of building strategic border roads, had laid off 1,000 causal workers, mostly Arunachalees. The decision was taken after Union MoRTH allotted a border road, sanctioned in 2011 for the BRO to prepare and submit the DPR, but it had gone to a private builder with a coterie allegedly serving as the bridge in the unholy nexus between the decision makers and people with vested interests”.
This news on being flashed had drawn the attention of highest authority prompting them to re-allot the road to the BRO that had facilitated reengagement of retrenched 1,000 local workers.
Hopefully, such vested interests would find no place now with present Govt led by Prime Minister Narendra Modi has made transparency and no-corruption as its buzz words.
