Brahmaputra Board chairman on Siang River dredging mission soon

From Our Correspondent

PASIGHAT, Oct 07:  Brahmaputra Board chairman Rajiv Yadav has assured to visit Pasighat during November next to inspect for possible dredging of Siang River bed.

This is the development after Lok Sabha member Ninong Ering recently appraised the river’s present situation to Union Water Resource Minister Arjun Ram Meghwal, who in turn took up the matter with the Brahmaputra Board.

Yadav has shown interest for the safety of those living along the Brahmaputra basin and consented to depute expert team headed by him to study and survey the river and its sites.

Ering had earlier suggested the Centre for dredging the river to solve the recurrent flood and erosion problems in the downstream areas like, Sigar, Raling, Motum, Borguli, Kongkul, Namsing, Gadum, Mer on left bank and Pasighat, Berung, Sika Tode, Sika Bamin, Jampani areas on the right bank besides downstream villages in Assam. He had urged for dredging and building of embankments along Siang banks which may cost approx. Rs. 2000 crore.

To bring permanent solution to over flooding and erosion of the downstream areas, Ering had urged the Minister and Brahmaputra Board to take up preventive measures, like dredging of river from Raneghat to Oiramghat in  Assam,  initiate dialogue with China on release of water from Yarlung Zangpo/Tsangpo dams in Tibet to solve these problems, like never seen unnatural behaviour of Siang river.

Meanwhile, the affected villages formed an NGO today in a meeting at Borguli village, namely Siang Eco-System Environment Protection and Nurture Group (SEEANG) to be headed by Yemling Tayeng as president, a retired ADC as GS while retired IAF pilot Mohonto Pangging will liaison with all authorities concerned including the Govts.

Related posts