TKE continues ‘breaking-making’ mission for 4-lane

By A O News Service

ITANAGAR, Mar 01: The T K Engineering Consortium Pvt Ltd has intensified its ‘breaking-making’ to develop NH-415 as four-lane aiming September 2021 as completion target with black topping was visible on a stretch of the highway here on Sunday.

A major hill in Papu Nallah area was still being cut and soil being transported by trippers continuously after cutting down two major hill stretches to pave the way for the four-lane to provide a please ride to the commuters.

However, the road was totally dusty creating problems for the commuters.

Related posts