Time for GoAP to put SLSA on priority radar, says Tagik

Water filled pothole of the road                          Collapsed RCC bridge                                       

By A O News Service

ITANAGAR, Jun 30: The RCC Bridge, connecting Directorate of Sports, Sanghay Lhaden Sports Academy (SLSA) and other colonies in Chimpu, was washed away by a strong river current of Konko Nallah on Tuesday morning while the temporary bride was dismantled by contractor of PWD causing untold suffering to the players, students and residents of the area.

Expressing deep concern over collapse of this bridge and untimely dismantling of the temporary bridge, lifeline for residents of the colonies as well as SLSA, Social worker Sangha Tagik, a local resident, accused the PWD for inordinate delay in constructing a permanent bridge. Poor quality materials were used to build a weak RCC bridge that ultimately collapsed, he alleged.

Without construing an alternate bride, was it not foolishness to dismantle the bridge, he questioned?

The road from highway to SLSA, the lone such institute of Arunachal Pradesh, is in a horrible condition with water filled potholes for last many years, but the PWD has turned a blind eye for reasons known to those who matter.

The national centre of excellence (NCoE) for boxing, Wushu and weightlifting was established at SLSA after signing a MoU by Sports Authority of India (SAI) regional director Dr Subash Basumatary and state’s sports director Tadar Apa in October 2020.

The event was virtually attended by then Union MoS for Youth Affairs & Sports Kiren Rijiju, state Youth Affairs & Sports Minister Mama Natung, SAI director general Sandip Pradhan, Chayang Tajo MLA Hayang Mangfi, Youth Affairs & Sports secretary NT Glow, among other officials.

Pradhan stressing on importance of the MoU had said it would “bring world-class infrastructures to NCoE”.

It is surprising that despite state sportsperson winning regional, national and global medals in various sports events, none bothers about the pathetic road condition even inside the SLSA complex, while present damaged bridge had added more woes to the players, who regularly practice in SLSA, Tagik said  and supported seven-day ultimatum served by All Chimpu Village Youth Association for the needful.

He called upon the authority concerned to get up from their deep slumber to renovate the road, build proper drainage system and a permanent bridge for smooth communication of large number of players, coaches, students and local residents.

Related posts