Ranganadi HEP renamed as Panyor Lower HEP to honour local sentiments: CM

By A O News Service

ITANAGAR, Dec 10: Union Ministry of Power has given its nod for modification in naming 405 MW Ranganadi Hydro Electric Project to Panyor Lower Hydro Electric Project (HEP), an effort to show respect toward sentiments of local populace.

The Ranganadi Dam is a concrete-gravity diversion dam on Ranganadi River (also known as Panyor River) in Arunachal Pradesh, a run-of-the-river scheme.

It aims to harness hydro power of Ranganadi River with power house located at Hoz in Papum Pare district. The installed capacity of the plant is 405 MW with a catchment area of 1894 Sqkm and design head of 304 m.

Taking to Twitter, Arunachal Chief Minister Pema Khandu extended gratitude to Union Power and New & Renewable Energy Minister R.K. Singh for the initiative. “I am glad to share that Union Ministry of Power has approved change in name of Ranganadi HEP to Panyor Lower HEP, showing respect to sentiments of local people. Gratitude to Hon Power Minister Shri @RajKSinghIndia ji.” he wrote.

Related posts