By Our Staff Reporter
NIRJULI | Sept 11 | Lodging complaint with capital administration against non fulfillment of assurance given by North East Regional Institute of Science & Technology to widen the diversion road, local villagers here today served seven-day ultimatum to NERIST.
In a representation to Capital DC, they sought his immediate intervention as the year-old assurance is yet to not met.
Nirjuli ASM Nabam Lama, on behalf of local people, in the representation, said that the link/approach road of Nirjuli-II, CLF colony, Rayo, Anya, Hokum, Emi Jate villages, which was built much earlier to connect new campus building opposite the Mian gate. But after construction of NERIST campus, the authorities have been pursuing the villagers for proper boundary fencing which needs diversion of the link road. The masses had consented considering national importance of NERIST and a diverted 800-mtr-long link road was built. The road width is too narrow for two vehicles to cross smoothly and in bad shape.
After several persuasion and submission of ultimatum on 14.12.16, residents of seven villagers conducted survey in April last, boundary wall marking was done and they were assured of widening of road but nothing has happened after several months.
The local PRI members have demanded immediate redressal of the genuine demand.
Meanwhile, few students of Nirjuli Secondary School who live in the locality said that they also face lot of inconveniences when the road is flooded.
Meanwhile, the DC said that this problem was not brought to his notice till date but said he would find solution soon in collaboration with NERIST and local residents.
