By A O News Service
ITANAGAR, Jan 25: Drain, drain and drain are three key ingredients for construction of sustainable roads, particularly in hilly region, quipped Border Roads Organization (BRO) Additional Director General (East) PKH Singh, responding to a question from this daily.
ADG Singh, who was on a four-day trip to Arunachal Pradesh to inspect under construction roads, recalled that this was his first lesson given by a commander rank officer whom he had reported after joining duty in 1988.
He was responding to a question as to why most of the roads in this hilly state either without no drainage system or defective drainage system used to be washed away or sustain massive damages during rainy days.
ADG Singh, accompanied with BRO Project Arunanak chief engineer Brig Anirudh S Kanwar and Ziro-based 756 commander Col K K Tiwari, is touring Upper Subansiri district and expected to inspect Maza, a border post located in the district along India’s Line of Actual Control, which was finally linked with rest of the country up at 3.30 pm on December 28 last under the supervision of site officer Capt Satyam and 128 RCC OC Lt Col Abhimanyu Qadian.
Brig Kanwar and 23 BRTF commander Nagaraja Kumar were first to drive the first set of vehicles on the road, accomplished by the difficult deadline set by Director General Lt Gen Rajeev Chaudhry despite tough hilly terrain, but three-month ahead of planning.
