MBSU reiterates plea for SIC probe against Raga project

From Our Correspondent

PASIGHAT, Nov 21: The Magong Banggo Students’ Union (MBSU) has reiterated its demand placed before the state Govt for Special Investigation Cell (SIC) probe into alleged corruption by the WRD engineers in Gueng-Diyung Lake water conservation project worth Rs. 1.87 crore.

These beautiful natural lakes located on top of the mountain of Riga village under Peging Bote circle of Siang district but without road connectivity and offer huge scope for developing as tourist destination.

The MBSU claimed to have lodged an FIR with Boleng police station against WRD Siang division engineers alleging corruption from tendering process as tender was floated for only Rs 1.13 core and the department had failed to clarify about the balance amount of Rs 74 lakh.

The retaining wall to stop out flow of water was not as per DPR and was nothing but an eye wash, MBSU president Koti Mize claimed, adding carrying sands, gravels and cement would be difficult as foot-walk of 3-4-km was too steep.

Related posts