Restoration of NH-313 on in full swing: Sources

Original road (1), damaged stretches of NH-313

By A O News Service

ITANAGAR, Apr 28: After incessant rainfall had triggered massive landslides on Thursday last that washed away a portion and damaged many potions of Roing-Anini Highway (NH-313) delinking the remote Dibang Valley district from rest of the country, the National Highways and Infrastructure Development Corporation Limited (NHIDCL) through BRO and EPC contractors swung into action to restore connectivity.

The 235-km NH connects Lower Dibang Valley district HQs Roing with Dibang Valley district HQs Anini, situated in one of the valleys en route to Line of Actual Control (LAC). The unprecedented rainfall caused extensive damages at multiple locations, including Ch 24+000, Ch 27+000, Ch 29+000, Ch 31+000 and Ch 32+000 KM between Hunli to Anini and left a trail of devastation by damaging infrastructures, dwelling houses and posing serious threat to life and properties.

As life had come to a grinding halt in Dibang Valley district as the NH-313 serves as its lifeline for movement of people and goods, many JCB and excavators were deployed to remove the debris to facilitate communication. Such prompt actions had helped crossing the slide area on Saturday approximately 125 vehicles from Anini to Roing, about 25 vehicles from Roing to Anini besides election teams with material laden vehicles on way to Itanagar en-route Roing, official sources associated with the operation informed this daily on Sunday.

As making the NH thorough may take few days, a team of Kolkata-based M/s GRSE has arrived to study and  suggest steps to bridge the breach at Ch 24+000 to expedite the process.  The commuters were passing the slide zone, which was very muddy, slippery and risky, few of them said after crossing the point.

Related posts