Landslides & floods cut off surface communication, isolate many villages

  • Death toll rises to 4

By A O News Service

ITANAGAR: Though incessant rains have taken a pause with sudden downpour, but the impacts   heavy rains in recent past which wreaked havoc across the state are visible with disruption of surface communication at many places.

A senior officer of PHQ on Monday, said that landslips triggered by unprecedented incessant rains have led to severe disruptions across several districts.

While Damin, Parsi Parlo and Panyasang administrative circles of Kurung Kumey district have been isolated from the rest of the state due to heavy rains and flash floods that triggered landslides. Multiple road blockages towards Damin via Parsi Parlo have been reported, severely affecting access to these remote areas, a social activist of the area said. The agonies of the locals have intensified by disruption of electricity supply and drinking water crisis due to major damages caused to water supply pipe lines in all these administrative circles.

Project Arunank of the Border Roads Organisation (BRO) had reported 78 landslides, collapse of three bridges and two culverts in the district, which had posed challenges for ongoing restoration works.

The Tezu-Hayuliang road is blocked at Mompani area in Lohit and Anjaw districts, while landslips have also obstructed Dari-Chambang and Palin-Taraklengdi via Langdang village PMGSY road in Kra Daadi district. Moreover, NH-513 remains not traffic worthy at Geying in East Siang district.

In Shi-Yomi district, tragedy struck on July 5 when landslips claimed the life of one individual, raising natural calamities related death toll to four since April.

The impact of floods and landslips has been profound, affecting over 72,900 people and 257 villages since April. Infrastructure damage includes 160 roads, 76 power lines, 30 electric poles, three transformers, nine bridges, 11 culverts, 147 water supply systems, 627 temporary houses, 51 RCC houses and 155 huts. Capital city Itanagar has been facing a severe water crisis due massive damages caused to pipeline and the ongoing restoration efforts may take several days as was indicated by PHE&WS EE.

A major landslip at Karsingsa along NH-415 was inspection by DC Shweta Nagarkoti Mehta that prompted her to close the road for safety and redirected traffic movement via Gumto-Doimukh.

Though restoration efforts are continuing by authorities concerned to mitigate the impacts and urging people to either remain indoors or exercise caution while moving out on emergency, but the people have to learn to cope up with such annual natural disasters.

Related posts