From Our Correspondent
TEZU, Aug 07: The dilapidated roads of colonies and many link roads of this township have been replaced by cement concrete road (CCR) recently giving sigh of relief to the commuters, particularly town dwellers.
Total 85-km road network, including about 21-km CCR, would be built by the PWD as a central sponsored scheme under Special Plan Assistant (SPA) to give a facelift to this district HQs, said AE Jonkey Darang.
About 5-km CCR of parts of Police colony, Official colony, Jubilee ground and its colonies, Amik Ringya Cultural road and part of GHSS Tezu-I play ground and its colonies have been built now and rest would be developed in phases, said PWD Tezu division EE A Gohain, adding delay in payment to contractor has been delaying the work. The CCR with bituminous pavement designs has to be strong, durable and cost-effective to prevent from being washed away by heavy rains and resist high temperature, he added.
