- SUMP aims to save Ane Siang and Adi society
By A O News Service
ITANAGAR, Dec 21: More than 100 civil society organizations and environmental groups have reportedly appealed to President Droupadi Murmu to direct withdrawal of Central Armed Police Force (CAPF) deployed to “facilitate” a pre-feasibility survey by National Hydroelectric Power Corporation Ltd (NHPC) for proposed 11,000-MW Siang Upper Multipurpose Project (SUMP) Siang River in Siang district.
Fearing displacement and adverse environmental impacts, the local Adi tribals have been protesting against the project and deployment of CAPF in the district last week.
Interestingly, Chief Minister Pema Khandu reacting to reported protests, in his address at a function at Boleng on December 19 had said, ““If you don’t want a dam, if you don’t want a hydropower project, there won’t be. Chapter closed.”
“But, the case at hand is not about a hydropower project. It’s about a multipurpose project, a project of national importance and envisioned by the GoI and the Niti Aayog.”
Khandu said that ‘misinformation’ is being circulated to brainwash innocent villagers against a project, which is not even in its pre-initial stage. People who are ‘instigating’ the protestors are themselves confused whether the said project is of ‘12500 MW’, ‘11000 MW’ or ‘10000 MW”.
“Being the CM, I am not aware, not even NHPC is aware of the exact wattage of power the SUMP will generate. How do you know the capacity of the SUMP when the survey and investigation process has not even begun?” he wondered and asserted that the SUMP is not all about generating hydropower.
“Hydropower generation is a by-product of multipurpose project by default. Its real objective is to save Ane Siang and Adi society that is connected with the river since time immemorial,” he had categorically said.
Elaborating on it, he said that China has already approved construction of a project that would generate a massive power of about 60,000-MW on the river, known as Yarlung Tsangpo in the Tibet region, just before entering India through Tuting in Upper Siang.
He revealed that the Chinese Govt, which is not a signatory to International Water Conventions, intends to divert the water from the multiple water reservoirs to be created under the project to dry regions of Tibet and elsewhere in the country.
“In such a scenario it is inevitable that volume of water in Siang River will drastically get reduced so much so that during winters you will be able to cross the mighty Siang on foot. Would you like such a situation? I certainly won’t,” Khandu reasoned.
The other reason for the project, he said is that in case China released water from their dams all of a sudden, a trail of unimaginable destruction will sweep through the Siang belt, Assam and Bangladesh.
The SUMP has been proposed by the GoI to maintain natural flow of water in the river throughout the year and flood modulation in case of water released by China, he had reasoned.
Reiterating that Arunachal Pradesh has about 50% of India’s hydropower potential, he said that the 12,500-MW to be generated from projects for which MoUs have been signed with PSUs will generate about Rs 10,000 crore annually for state exchequer.
Deputy Chief Minister Chowna Mein also quashed all misconceptions created by some anti-dam activists and termed the SUMP as a national project declared in 2008 aimed at ensuring national security by neutralizing China’s plan to build a 60,000-MW dam in its upper stream having potential risks for people living nearby Siang River and downstream areas. He termed SUMP as a strategic boon for development and welfare of local community by addressing critical challenges like flood control, water storage, irrigation, navigation and power generation
