- 1300 unconnected villages to be linked: CM
PIPSORANG, Jan 22: Arunachal Pradesh inked another milestone with this remote place in Kra-Dadi district under lone unconnected Tali assembly constituency among 60 of the state getting road connectivity on Wednesday after 78 years to go down the history.
Adopting ‘seeing is believing’ principle, Chief Minister Pema Khandu, along with Union Parliamentary Affairs Minister Kiren Rijiju, Rajya Sabha member Nabam Rebia and state Urban Development Minister Balo Raja travelled to Pipsorang, recently upgraded to a SDO HQs, by road from Tali, which remained unconnected till 2022.
It may bwe recalled here that the CM on 27.02.22 had andu opened the road to Tali by reaching the last unconnected administrative center travelling all the way from Itanagar by road to join Nyokum festivities there to achieve two milestones – he was first CM to reach Tali by road and first CM to join Nyokum celebrations.
“The next goal is to travel by road from Tali to Pipsorang in the next couple of years,” he had announced and fulgfilled his promise today,” CMO reported, adding that while congratulating local legislator Jikke Tako, constructing agency RWD, local administration, contractor and local people for the feat, he urged them to ensure completion of the entire project within one month.
He observed that the newly built road needed gradient mo K C Dhimole, difications and alignment changes at various points to avoid steep climbs and sharp turns.
He advised accompanying state’s technical advisor K C Dhimole, to assess, re-align and re-design and complete the process within a month. He directed the EE concerned to constantly monitor progress and visit the sites frequently.
“Project AE in-charge should visit the sites and stay overnight to oversee the work and all JEs should stay on the ground, sleep in the camps and coordinate with contractor till its completion,” he said and observed that even if the road is still ‘kutcha’ the ease of connectivity it has brought all of a sudden to people of Pipsorang and nearby villages is huge.
“I assume 30% work still remains for its completion and assure that it will be done within a month,” he said.
The 55 km Tali to Pipsorang road is being executed by RWD under PMGSY flagship scheme.
The CM reiterated that the GoAP’s top priority is road connectivity and assured approval and sanction of roads to yet-to-be connected villages in the area as urged by local ML, including Tali-Pipsorang road to Haa village, Nyobia to Keba, Ripum to Raha village and upgradation of the road from Roing to Lodo Kore village.
Recalling his last trip to Tali in 2022, he said that the stretch from Joram-Koloriang Trans-Arunachal Highway to Yangte was in very poor condition, he disclosed that funds were sanctioned for upgradation of that stretch soon after.
“I am happy to note that work on that stretch has begun on ground. Next time I will come by road from Itanagar to Yangte-Tali and all the way to Pipsorang,” he said.
Informing that about 1300 villages across the state are yet to be connected by road, Khandu assured that no stones will remain unturned to connect all these villages in the next few years.
He further informed that several projects, mostly road construction, worth Rs 515 crore were ongoing in the assembly segment and announced new sanctions worth Rs 44.50 crore.
The newly sanctioned projects include infrastructure creation for Pipsorang SDO office, infrastructure development for newly established administrative circles of Paya and Nyorik and construction of the Tali township roads.
Khandu also assured to provide funds for construction of an outdoor stadium at Taki to tap the sporting potentials of the youth.
He advised local MLA to stay put in his assembly constituency and regularly monitor all ongoing and upcoming projects for quality and timely completion.
“If the local MLA is at station, officials and contractors will remain in station ensuring smooth progress of the projects,” Khandu added.
The CM also inaugurated newly built Boa Sango to Neomi road and a circuit house at Tali, laid foundation stones for a road from Tugmar to Guha under CRIF and Parsi Parlo PWD road Kopin to Hapuk, Pija to Habak, Tali-Pija PGSY road to Richik and Tali-Pija PMGSY road to Neopum under the Vibrant Village Programme.
