ITANAGAR, Jun 04: Home, Public Health Engineering & Water Supply (PHE&WS) Minister on Wednesday inspected damaged sections of Itanagar Water Supply Pipeline that caters to entire Itanagar Capital Complex.
The 450-mm diameter main water supply pipeline originates from Mepu-Mehi, a tributary of Poma River. Due to incessant rainfall over past few days, the main pipeline suffered serious damages near Ganga Lake Road (Bedi-Beda Point) and near Poma Village (Crusher Point). Massive earth movement in these areas has caused significant displacement of pipelines leading to major disruption in water supply.
Partial restoration efforts are currently underway. A temporary 200-mm diameter line has been put into service to maintain some level of water distribution. However, the 400-mm diameter main line has been shut down temporarily to prevent further damage and possible breakage.
The PHE&WS department has deployed adequate men and machinery to divert main pipeline from landslide-prone zones to ensure its stability for long.
Natung sought full cooperation of the public to the department in executing this challenging task.
For convenience of the masses, water tankers have been pressed into service, and emergency control room numbers activated. Citizens are encouraged to use these facilities and report any issues promptly.
In light of recent incidents and loss of lives due to landslides in the region, the minister advised the public to remain vigilant while traveling during the ongoing rainy season.
Natung was accompanied by his advisor-cum-MLA Pani Taram, CE (WZ)Toko Jyoti, SE Tayem Tok Camdir, EE, AE and JEs of the department. (PRO)
