ITANAGAR, Jun 21: Women and Child Development Minister Dasanglu Pul on Saturday undertook a strenuous trek through rugged terrain to reach Monpani (KM 78+000) along the Tidding–Arrowa section of National Highway-113, which remained blocked due to massive landslides triggered by heavy rainfall.
The strategic highway, vital for connecting border areas along the Indo-China and Indo-Myanmar frontier, has been cut off for more than eight consecutive days, severely affecting the movement of essential supplies to forward locations, such as Kibithoo and Chaglagam.
Pul, addressing residents at the site, announced construction of a permanent bypass road, expected to be completed within two years. “Our government is committed to ensuring uninterrupted connectivity to all corners of Arunachal Pradesh, especially in border districts like Anjaw,” Pul said, thanking locals for their patience and resilience.
A temporary access would be restored by 4 pm on Sunday and repair work commence the next day. She further, she assured.
The landslide-hit stretches within the critical Arrowa–Khupa–Hayuliang corridor suffered extensive damages, including surface cracks and slope dislocationdue to continuous monsoon downpours.
Given the region’s strategic importance, the state and central governments have prioritized restoration of connectivity. The National Highways & Infrastructure Development Corporation Limited (NHIDCL) has been directed to expedite both temporary relief measures and long-term solution, Pul informed.
Pul was accompanied by Namsai MLA Zingnu Namchoom, Anjaw ZPC Soblem Pul, DC Millo Kojin, SP Rike Kamsi, NHIDCL general manager Arindam Handique and Bhartia Infra Projects Ltd engineers. (PRO)
