DCM launches DHPD-2

  • Push to “Powering Progress, Naturally”

ITANAGAR, Nov 14: Deputy Chief Minister Chowna Mein on Thursday launched a rebranded future ready identity for hydropower department, beginning of ‘DHPD-2’, a unified effort to accelerate hydropower development while safeguarding state’s ecological wealth.

The initiative, signaling a renewed push towards clean energy transformation, is the outcome of maiden annual review meeting of Hydropower Development Department (HDD), where Mein noted that Arunachal Pradesh holds nearly 40% of India’s total hydropower potential, of nearly 58,000 MW yet only about 1% (1,227.12 MW) has been harnessed so far.

Around 31% is in advanced stages of approval to enter construction, while nearly 57% remainsuntapped, Mein said, adding the GoAPis committed to unlock this potential for state’s growth and India’s clean energy transition.

The GoAP has declared 2025 to 2035 as ‘Decade of Hydropower’ for focused attention and attract major investment. Projects of nearly 19,000 MW capacity are expected to be commissioned in next decade with investments of around₹1.9 lakh crore, he said, adding hydropower is not just an energy source but a catalyst for building an industrial ecosystem for the state.

“Skill development is essential for growth of the HDD and progress of the state for which we need skilled manpower”, he said reiterating importance of skilling, adding hydropower needs specialized expertise for which structured month long training has been introduced to boost technical abilities.He announced to fully revamp the HDD with restructured DHPD-2 and stressed the need to strengthen human resources.

Unveiling the HDD’s new logo and tagline “Powering Progress, Naturally”, Mein said the redesigned identity reflects state’s belief that development must progress in harmony with nature. The logo, featuring the rising sun, flowing rivers, dams and power lines, represents state’s transition towards a cleaner and more sustainable energy future.

The meeting, attended by Hydropower Advisor Ninong Ering and senior officials, engineers, policymakers and stakeholders, assessed ongoing projects, strengthen inter-departmental coordination and outline long term strategies for tapping state’s huge hydropower reserves.

Highlighting complexity of the sector, he noted that “Hydropower involves large and complex projects. This makes skilled manpower even more important. That is why we have introduced structured month-long trainingfor our staff to enhance their technical capabilities,” he said.

Projects of large capacities earlier allotted to various private developers, which failed to execute and were terminated., he said added some projects originally with CPSUs were also re-allocated during that period. “Over time, it became clear that a new approach was needed to fully realize state’s hydro potential,” he said.

The GoAP led byChief Minister Pema Khandu, the state government has adopted a proactive and structured strategy to revive stalled projects and19 projects in first phase have been reassigned for revival with the GoI support, whose works have been progressing in a focused manner.

After handing over basin-wise charges to chief engineers as per DHPD-2, Mein also felicitated outstanding HDD engineers, acknowledging their dedicated service in improving infrastructure and project execution. Their works stand as a model of technical excellence and teamwork in state’s energy sector, he said.

Approved by state Cabinet on 13.05.25, the restructuring aims to make the HDD more efficient, accountable and technically empowered to meet growing hydropower demands of the state.

Related posts