RANEGHAT, June 29: Project Brahmank of Border Roads Organisation (BRO) celebrated its 16th raising day in its headquaaters here on Monday, .marking 15 years of dedicated service for development of strategic infrastructure and connectivity in sensitive borderstateof Arunachal Pradesh.
Raised here in East Siang district this day in 2011, it became fully functional on 03.12.11 and since then playing a pivotal role in strengthening road infrastructure in the region.
It is responsible for development and maintenance of strategic road infrastructure across Siang, East Siang, West Siang, Upper Siang and Shi-Yomi districts besides parts of Dhemaji district in Assam.
Operating in some of the most remote and challenging regions of the country, Project Brahmank works under difficult conditions characterized by rugged terrain, frequent rainfall, poor connectivity and limited infrastructure. Despite these challenges, it has been instrumental in providing strategic and operational connectivity to the Armed Forces while bringing remote villages into the national mainstream.
It is entrusted with the maintenance and development of 811-km of roads and approximately 86 bridges, ranging from culverts to major steel and arch bridges. Some notable engineering achievements include 100 metre steel arch bridge over Siyom Nallah and 165-metre PSC bridge over Simang Nallah on Along–Yingkiong road.
During FY 2025–26, it achieved significant milestones with the inauguration of 13 bridges having a cumulative span of 390 metres across Siang and Siyom Valleys and blacktopping of 61-km roads to NHDL specifications, developed helipads to improve connectivity and strengthen strategic infrastructure in the region.
As part of the raising day celebrations, various social outreach and welfare activities were organised in the HQs and taskfForce locations, including medical and dental camps in Tuting, Menchuka, Aalo, Yingkiong and Likabali, cleanliness drive, tree plantation drive, road safety awareness campaigns, cycle rallies, yoga sessions, painting competitions, run/walk events and educational outreach programmes, reflecting its commitment to community welfare.
Sainik Sammelans, troop interactions and mess functions were also organised to foster camaraderie among personnel.
Despite difficult terrain, heavy rainfall and frequent landslides, Project Brahmank led by chief engineer Subhash C. Looniya continued to maintain vital connectivity to border and remote areas. Through its unwavering dedication and commitment to nation-building, it remains a key contributor to socio-economic development of the stte and the strengthening of India’s strategic infrastructure. Thus, all its egnineers and personnel reaffirmedtheir commitment to excellence, service and national development, according to BRO sources..
The BRO currently operates 18 field projects spread across 11 states and 3 union territories in India,with footprints in neighboring countries, like Bhutan. But, Project Brahmank is a strategically vital division for operating inone of the most sensitive states of India.
