Sir,
With utmost respect and humble submission the undersigned, I would like to submitting grievances on behalf of Jime village for kind consideration of chief minister, I would like to point out that the village under Dari circle in West Siang district is situated in the eastern most part and was set up in 1986 for settling inhabitants of Doye and Jorjee villages. Jime has been settled in the middle point of both the villages nearer to Zirdo village which is connected with road communication and it was jointly settled in order to get better road connectivity.
There are only 13 households with more than 140 and 91 electors. Most of the households are dependent on nearby markets for essential commodities. Thus, the villagers have to trek through tough mountainous terrain to reach markets to procure essential items. The village has no healthcare facility for which the villagers have to walk around 15-km on foot to purchase even tablets for headache and fever. The medical staffs, like DHV, health assistant never visits the village due to tough terrains without a road.
The residents used to lift the emergency patient through local made stretcher in a narrow footpath till motorable road at Zirdo village and three dead bodies have been lifted from Zirdo village so far while countless emergency cases are being lifted regular for want of road connectivity. Diarrhoea took an epidemic form in July 1999 claiming lives of two male toddlers for want of emergency health care facility besides non-existence of road.
Jime boasts of fertile land for which the villagers cultivate lemon, cardamom, ginger besides practicing poultry, piggery, fishery and livestock rearing for economic sustenance but fail to get remunerative prices for their produces for lack of proper road communication .
The GPM since its re-inception neither got an opportunity for gram chairperson nor to become anchal samity member. The ASM segment is attached to Zirdo village for which developmental activities have been completely neglected and concentrated at Zirdo only.
Jungle clearance and formation cutting of Zirdo-Jime rural link road was started from Jime village during 1991-94 but only two-km was completed. The work from Zirdo village meted with same feet in during 1996 to 1999 with completion of two-km only. Thus, two-km of total six-km is still untouched.
However, in 2012,it was informed that Rs 22 lakh has been sanctioned from PM package against Zirdo-Jime link road. The JCB had carried out jungle clearance and formation cutting the same year. But 500-m left out for jungle clearance and formation cutting. In March 2013, JCB carried jungle clearance and formation cutting. However, after completing 500-m new cutting, the JCB reached Jime village without clearing the debris of road built during 1991-94.
The road is very narrow on which motor cycles could reach at that point of time. Reportedly Rs 10 lakh was sanctioned for the road b the GoAP under SPA.
Moreover, more than Rs 39 lakh was sanctioned in 2014-2015 under SPA vide sanction order No. SRWD- 66/Sch/RLR/SPA/2013-14 , dated 20.10.14 (C/O Link Road under 29th Basar, Tirbin and Daring Circle, West Siang District under RWD Division Aalo) but the same was completely misappropriated by the erring officers and contractors without investing a single penny.
As the erring officers and contractor claim to have carried out jungle clearance and formation cutting on 28.02.2015 to 20.03.2015 (as per record), the records itself is contradicting. Thus, there is no question of physical execution of aforesaid nature of work as it was already completed in March 2013 (video-graphs and photographs submitted to chief vigilance office-CVO).
A complaint is pending before the CVO for more than 15months due to unfair and bias inquiry carried out by Gensi circle officer and special investigation cell (SIC). Moreover, the subsequent complaint letter is also pending in the vigilance department which seem to be done with malafide intention by some officers/officials (which also require immediate enquiry). The aforesaid complaint is still pending for re-inquiry by the SIC despite of submission of sufficient incriminating evidence in form documents, photographs, video-graphs etc. and the series of subsequent complaints. Now the authority concerned seems to be deliberately adopting a dilatory tactics to demolish the case.
Therefore, a meeting on 29.04.17 by villagers, GoAP staffs and students while condemning such lackadaisical attitude of elected representatives and GoAP have unanimously pleaded for immediate sanction of fund for road construction. They also resolved to resort to peaceful protest by pledging ‘NO ROAD, NO VOTE’ as villagers have left no alternative but to lunch protest in a peaceful manner by boycotting the election process in the village in 2018 and general & assembly election in 2019.
Thus, they pleaded for initiation of an appropriate action against all concerned involved in misappropriation of fund meant for the said road.
The villagers would remain ever grateful to you for your prompt action.
Yours sincerely etc,
Gojum Riba, Advocate, Jime village