Day long rainfall cause trail of devastation

By Our Staff Reporter

NAHARLAGUN, June 14: Day-long incessant heavy rainfall beginning since Tuesday mid-night has left a trail of devastation in various parts of Arunachal Pradesh while landslides at several have been reported causing untold suffering to the people.

Road connectivity disrupted in Anjaw district too throwing normal life out of gear in state’s easternmost district bordering China.

All-important road connecting Hayuliang with district HQs Hawai has been blocked after landslides hit the road in between Lautul and Kherang. It was, however, cleared by M/S Sushee Infra & Mining Pvt Ltd under NHIDCL on Wednesday.

While the block points at 26 Hollong Nallah and Dhanbari Nallah were cleared on today, connectivity in bridge point over Moody Nallah at 21-km which had collapsed on April 24 last has once again washed away by heavy spate of river flow, thus making it impossible to cross over.

Anjaw DC Mamata Riba, stationed at Hayuliang to orientation meeting of HoDs on annual development agenda, sought the NHIDCL and GREF help to clear road blockage.

Informing that no life has been lost till now, she exhorted the public to maintain caution, avoid travelling till the heavy downpour subsides.

The Doimukh-Hoj Potin stretch of Trans-Arunachal Highway (TAH) is a glaring example where commuters were stranded for hours together due road blockade at several places. Those coming from Kurung Kumey, Kra Daadi, Lower Subansiri, Kamle and Upper Subansiri district had to remain stuck for several hours on the road due to same reason.

Kra Daadi district administration, in an order, restricted plying of heavy vehicles as road near Tassar village along Joram-Koloriang road was completely washed away. However, K/Daadi administration by engaging M/s TK Engineering & Consortium Pvt Ltd made temporary diversion for light vehicles to ply but the road is not traffic worthy for heavy vehicles. Thus, the public has been urged to avoid travelling during heavy rainfall. Portions of Joram-Koloriang between Palin- Shakti, Palin-Yapap road have been washed away, local sources said.

However, Kurung Kumey DC Kanki Darang told this daily said that though heavy rainfall was recorder during last days but today is normal.  Few landslides along the TAH connecting the district had occurred which have been temporarily resorted by building sub-way. However, a red high alert has been sounded, he added.

Papum Pare DC in-charge Tabang Bodung said that a disaster management plan has been prepared to face any situation but a comprehensive plan would be evolved soon, he added.

Related posts