Hanging bridge collapses as Dikrong River swells

NAHARLAGUN, Apr 04: The torrential rains for last few days with the beginning of monsoon season during last few days, particularly on Monday, turned Dikrong River furious which resulted in collapse of under construction hanging bridge over the river and disconnection of short cut road to Borum railway station via helipad here, Borum resident John Panya told this daily over telephone from the spot.

The Naharlagun-Yupia road to Borum railway station has also been washed away, he said, adding with the heavy rains continuing the consequences could be much severe.

Our Staff Reporter adds: Two temporary bridges over Pachin River that connects Yupia, Borum, Naharlagun and Nirjuli have been washed away

While small portion of land getting washed away is posing serious threat Papu Nallah Bridge.

A minor landslide near 6 Kilo along NH-415 has been causing inconvenience to the commuters travelling between Naharlagun to Itanagar.

The heavy downpour also poses threat to under construction of NH-415 near IG Park, which was washed NH-415 near IG Park in May 2021.

Itanagar Capital Region Talo Potom has urged the people, particularly those living in vulnerable areas, to take precaution to avert any disaster likely to be caused by monsoon triggered rains. The dwellers whose houses are located near the rivers, stream and low lying areas to be more watchful as heavy downpour may continue, he said.

He further informed that the district disaster management officer, including all officers including EAC in Itanagar, Naharlagun and Banderdewa have been directed to remain alert.  

Related posts