ITANAGAR, May 11: The Fact Finding Committee (FFC) constituted by the state government to ascertain facts on the sundry issues raised by social activist Sol Dodum, has recommended the state government to upgrade the design of the WTPs at Seppa using latest available methodologies and technology.
The three-member committee, comprising Civil Aviation Secretary Swapnil Naik, PWD Chief Engineer Tayu Garu and DIG (Hq) Michi Paku, in its recommendation stated that the system was satisfactory in olden times since there was clean, uncontaminated water at the sources. However, with increasing population and more settlements coming up, turbidity and contamination has increased due to landslides, settlements, on upstream side of water sources.
“Besides discouraging settlements in catchment areas, there is need to convert to full-fledged sedimentation tank of four hours detention period. Five such tanks at Seppa could be reactivated in the existing water supply schemes,” the committee recommends.
The report of the committee, which was submitted to the state government on Tuesday, further recommended immediate action to notify water sheds and catchment areas of all drinking water sources in the state.
“It is seen that there are major issues of non-notification and protection of catchment areas leading to developmental activities, mostly unauthorized, like leveling of ground and dumping of garbage in newly expanding settlements. There is lack of security arrangements at the source points as most of these are in interior areas thus there is possibility of willful sabotage and contamination. PHED may designate some of the staff as guards to keep a regular watch on these sources,” the committee suggested.
It further added that the system of functional posts in various departments especially, technical departments, need to be looked into. Though the system may be the best option in the given circumstances like manpower shortages, it is giving opportunity to organizations and public to question the capability of otherwise competent and experienced incumbents.
The committee during its course of inquiry observed that the water works at Kuchi Nallah which are quite old may be upgraded in view of the changed environmental requirements. The existing water treatment plant at Macha Nallah be further strengthened by using latest available technologies and certain design changes would help in boosting the existing project.
It further observed that in regards to Nyari Welly WTP; the works need to be completed as per timelines so that better treated water could be supplied to Seppa township. After completion of the project, entire Seppa Township will be supplied water from this source and reliance on other sources would be minimal.
“Services of registered and experienced technical consultants be utilized, including for design, execution and monitoring of work through EPC mode. Design of WTPs could also be proof checked through empanelled institutes,” the committee observed.
Further, action may be taken by DC office and PHED to complete the works of all the three WTP projects in Seppa as per timelines decided in the meeting held under chairmanship of Sports and Youth Affairs Minister Mama Natung and notified by the DC. Strict and personal monitoring should be done by the District Level Monitoring Committee along with DC and PHED, it observed.
As regards to the allegations against DC and also as regards action not taken by the police, the committee observed that the action taken by DC and police is satisfactory as per rules and requirement of public safety and security.
“The allegations about impure water are due to various reasons, principal among which is uncontrolled development and unplanned settlements in catchment areas and around water sources. The old design of WTPs initially constructed way back and lack of regular maintenance also are factors,” it observed.
The committee in its observation added that the PHED had taken a number of steps to improve the water supply in Seppa Township which has to be monitored closely by the department at district and state level for timely execution.
Engaging experienced technical consultants for studying the existing WTPs and suggesting technological improvements in view of growing populations and negative impacts of development would help, it added.
Meanwhile, the state government after perusing and going through the report has decided made public the factual findings of the committee, as with the gist of suggestions and recommendations being disseminated for the general information of the public in Seppa as well the district level department functionaries for eliciting full cooperation and assistance to PHED & WS, District Level Monitoring Committee and other related departments for proper execution and timely completion of works related to improving water supply in Seppa Township.
The government also decided to constitute a core group of officers at the state level under the chairmanship of PHED & WS Minister Wanki Lowang to oversee implementation of the projects taken up in Seppa as well as explore latest, cost effective and viable technologies and designs for water supply projects. (DIPR)