From Our Correspondent
BOLENG, May 24: The Nugong Banggo Kebang (NBK) of Siang district in a written statement has alleged negligence in completion of Nugong Bridge over Siang River and appealed to the Govt agencies concerned to conduct technical load test while rectifying and completing the incomplete portions of the bridge.
NBK general secretary Tanyong Taloh said that “the Nugong Bridge’s wind anchor blocks are incomplete and knots-bolts are found loose which need early rectification and correction to avoid any eventuality in future. The Nugong steel suspension bridge was inaugurated on 06.12.22 for public use in a hush-hush manner before its actual completion. But NBK members during their inspection on Sunday have found lot of doubts about its capacity and future reliability.
“The bridge’s strength lies on the wind anchors as the mere suspension cabbies can’t hold the bridge. Thus, massive anchorages are needed on both ends of the bridge. The knot and bolts of the bridge were found loose during inspection which creates fear among the local people of eight villages of Nugong Banggo. In case of any fault, it would adversely affect them,” thus the NBK seeks early rectification of the faults in public interest.
