By A O News Service
ITANAGAR, Feb 24: With hundreds of tourists and civilians stranded near Tawang, located at an altitude of 8,757-feet, due to severe snowstorm for last two days, Chief Minister Pema Khandu made an exceptional on Friday and asked BRO to open Sela Tunnel ahead of its inauguration to rescue all stranded.
Moreover, there was a warning of an avalanche also due to this heavy snowfall as per reports that prompted
Khandu to direct the Border Roads Organisation (BRO) to open under-construction tunnel to facilitate smooth passage for travelers to and from Tawang.
The Sela Tunnel, which is expected to be inaugurated by Prime Minister Narendra Modi in March, will significantly reduce travel time and improve accessibility to Indo-China border areas, especially during harsh winters.
Senior citizen tourists from Mumbai praised the efforts of personnel of Special Service Bureau (SSB) and the army, who provided them with shelter and facilitated their rescue through the tunnel.
One Jagdish Dedhia said, “Ours is a hot city (Mumbai) and we never experienced such cold weather at -9 degree and such snow storm. But it is a great memorable experience for us, Arunachal as a whole is no less than Switzerland and has a breathtaking beauty sans this snowstorm experience.”
“The SSB personnel came to rescue us and gave us one room with a heater in their barracks. There was a lack of facilities in Sela Pass. Ultimately, when CM Arunachal gave the order to open Sela tunnel for tourists and army vehicles we got relief and were rescued through the tunnel, though officially not inaugurated as yet,” another tourist said. Despite the ordeal, the tourists compared Arunachal to Switzerland for its breathtaking beauty and memorable experience.
Two days of snowstorm at Sela Pass led hundreds of tourists Stranded near Tawang as vehicles started skidding and got stuck after the snowstorm. “The Sela Tunnel will be opened for public use as and when required before its expected inauguration in March first week. We have communicated the same to the authorities concerned,” Khandu said while addressing a rally at Dirang.
Sela Tunnel is expected to be completed and opened in March next. The project with 2 tunnels (980-m and 1555-m) and 8.78-km approach roads is under construction by Patel Engineering Ltd.
The Sela Tunnel, stretching through the Sela–Charbela ridge that separates Tawang district from Dirang circle in West Kameng district, will be the world’s longest bilane tunnel at 13,000 feet. This strategic Sela tunnel, being built BRO’s Project Vartak, once fully operational will facilitate the army’s rapid response to security challenges and enhance its presence in the forward areas.
