Brahmaputra Board chief urged to clear Rs. 2.52 cr liabilities

PASIGHAT, May 15: Brahmaputra Board (BB) chairman Dr. Ranbir Singh, a retired IAS officer, Under Union Jal Shakti Ministry, during his May 12 and 13 visit here, inspected Remi and Oyan projects, being executed by BB’s Itanagar Division.

He also visited two project sites which are in proposal stage proposed under FMBAP by Water Resources Department (WRD) Pasighat Division. Those are erosion control and flood management work along Siang River and erosion control and flood management work over Sibokorong River.

During a meeting with the DC, SP, WRD CEs of East and West Zones, Dr Sungh said that the BB is always ready to give technical guidance to Arunachal Pradesh and sought cooperation. The state should have its own State Water Policy and Flood Plain Zoning Act to avail centrally funded schemes.

While informing about pending liabilities of Rs. 2.52 crore against FMP schemes, WRD CEs urged him for early clearance and requested to evolve basin-wise master plan of all state basins.

DC Tayi Taggu urged the BB and WRD to come up with nature-based schemes in future as natural course of river should not be disturbed. All rivers and streams in Adi belt have ownership, a good practice, which would make protection of river/stream and their catchment areas easier and effective, Taggu added. (DIPRO)

Related posts