Raja directs steps for smooth traffic management in ICR

ITANAGAR, July 13: In order to carry forward decisions taken by Pema Khandu Govt.3.0, in its first cabinet meeting on June 13 last, Urban Affairs, LM & CA Minister Balo Raja, in a meeting on Friday had preliminary discussion on effective traffic management in Capital City.

The meeting was attended by commissioner (UA & Transport), CE (UD), DC (ICR), SP (Traffic), directors (town planning) & ULB, joint director (housing), CEO (Smart City Mission), among others.

Raja apprised that the issue for effective traffic management as one of the important topics to make a world-class future ready Itanagar-Naharlagun twin capital city, as identified in  24 high-priority decisions of the cabinet.  The house after discussion in detail recommended following steps to address this grim issue as quickly as possible: Present system of traffic regulation needs to be replaced with adoption of the latest state-of-the-art technologies; road dividers are to be provided in a scientific manner to make the city beautiful and facilitate easy movements of vehicles and pedestrians; automated traffic signal lights combined with AI cameras are to be erected at all the identified junctions in Itanagar starting from Chimpu to Rajnivastinali at ‘B’-sector for Intelligent traffic management; construction activities of NH-415 on Papu-Nallah to Nirjuli stretch between carried out now be replicated at Naharlagun city once it is completed; everyone should be trained to follow the traffic rules strictly, especially by the two wheelers & tempos; proper bus/tempo bays are to be provided.  Bus/tempo should come and pick up/drop the passengers on regular intervals without allowing the vehicles to park there for longer time; only ‘two lanes’ movements be allowed on both sides of the NH and none should be allowed to pass either through middle of the road (in between two vehicles) or through the sides of the roads in a haphazard manner by crossing the lines; aartificial intelligence cameras installed all along the NH under smart city mission, should be synchronised with the traffic signal lights to detect traffic violators properly and sent with e-challans to the registered mobile numbers of the owners/violators and the DTO concerned simultaneously; the e-challan needs to be made operational with trial mode for one month and all should adhere with the system on expiry of the trial period; traffic signal lights should be installed in such a manner that vehicles coming from one side be allowed to travel in one go either to right, left or for taking a ‘U’-turn with specific slots for pedestrians.  As a short-term measure, till the signal lights are provided and made operational – the present traffic movements be allowed to adopt and follow this system for which the traffic wardens be trained accordingly; public awareness on the do’s and don’ts be made through FM radios, social media platforms such as Facebook, Instagram and ‘X’-handle frequently, which includes the importance for paving passage for ambulance/fire/police(on duty); establishment of “model traffic park” in the city for making public aware about the traffic rules and signals; only right side parking of vehicles on the one-way traffic paths/roads; making the parking slots available for the public for 24×7 and encourage them to park their vehicles only in the parking areas/placeson free of cost initially for a certain period, so that the public get customised & familiarised themselves with the system and adopt with subsequently; relocating the street vendors to appropriate vending zones/slots; relocating the tempo/sumo parking slots/stands; implementation of the report prepared after having spot verifications by the Police and other line departments; regular cleaning of the city and repairing of footpaths & drainage; strict implementation of Building-bye-Laws through ICR DC and preparation of City Mobility Plan as suggested by the GoI towards ease of movements.

Raja entrusted commissioner (UA & transport) for further discussions on the matter with all its line-departments and stakeholders for implementation of the above action plan and come up with a detailed report by next fortnight for further steps to be followed.

On receipt of the action taken report from him, a coordination meeting would be convened with all stakeholders including Itanagar MLA-cum-advisor to minister (UA) and IMC Mayor for its effective management, according to an official release.

Related posts