1st road construction using FDR technology begins in Arunachal

From Our Correspondent

TEZU, May 25:  In a landmark move towards eco-conscious and sustainable infrastructure development, first road construction project using Full Depth Reclamation (FDR) technology under Pradhan Mantri Gram Sadak Yojana (PMGSY)-III was officially launched in Arunachal Pradesh here on Saturday.

Rural Works Department (RWD) Minister P D Sona accompanied by Advisor to RWD Zingnu Namchoom and Tezu MLA Dr. Mohesh Chai ceremonial flagged-off the work in presence of EE. Heads of offices and local residents.

FDR technology, widely acclaimed for its green methodology, reuses the existing distressed bituminous surface and a specified portion of the underlying base. This reduces the need for quarrying and material disposal, making the construction process more sustainable and cost-effective.

Three major roads are being built with FDR technology: 5.80-km Tezu to Lama Camp (₹443.82 lakh), 5.96-km NH-52 to Doorah Nallah (₹472.86 lakh)  and 28.12-km New Seren circle to Nari HQ (₹2,493 lakh).

With a combined length of 39.88-km, the bundled projects were awarded to M/s Sedi Allied Agency after competitive bidding. Given that the machinery cost for FDR ranges between ₹5–6 crore, consolidating work under one contractor ensures optimal resource use and financial efficiency.

This pioneering initiative is poised to set a benchmark for sustainable road building in the region, aligning with PMGSY’s broader goal of upgrading 1,25,000-km rural roads nationwide. FDR is especially relevant for hilly and environmentally sensitive areas, like Arunachal Pradesh, offering a model for Public Works and Rural Works Departments across the state.

Related posts