- Yingkiong in darkness for 3 days
YINGKIONG, Jun 05: Road connectivity to Tuting sub-division of Upper Siang district, completely severed at multiple locations along Janbo to Migging stretch due to massive landslides triggered by prolonged incessant rainfall, was restored and opened to traffic on Thursday.
The nearly month-long disruption of road connectivity had paralyzed normal life putting the residents of the area to untold sufferings.
The continuous road blockage had caused severe hardships for the public. road communication was totally cut off for last 20 days forcing daily commuters, many with urgent personal or official commitments, to traverse through the treacherous jungle footpath from Singging village to Palling alongside left bank of Siang River on foot for around four hours to reach district headquarter Yingkiong, according to Tuting ADC Pandov Perme.
The situation was further aggravated due to shortage of essential commodities, including petroleum, oil and lubricants, which were not available since May 14. The mobile network was also affected adding owes to injuries of the residents, his report said.
In an unfortunate incident on June 3, a truck laden with empty LPG cylinders while returning from Tuting was thrown away from the road by a landslide, which had fallen into a ditch between Migging to Mosing. Fortunately, no loss of life was reported.
Yingkiong has been without electricity for last three days adding to the crisis. Landslides along the Janbo-Bomdo road damaged electric poles disrupting power supply to directly affecting normal lifes of the people. The Electrical Department has deployed men and machinery for early restoration of power supply. But, persistent inclement weather has been hampering the restoration works.
The district administration, which has been closely monitoring the situation in coordination with BRO 761 BRTF commander, has sought cooperation of the masses and assured of all efforts on war footing to restore essential services and normalcy in the affected areas. (DIPRO)
