YINGKIONG, Nov 26: Upper Siang DCTalo Jerang along with SP Token Saring and RWDEE Gatling Lipir inspected under construction 43-kmJido–Palling PMGSY Road on Wednesday on a tractor to get firsthand knowledge of the progress.
This Pradhan Mantri Gram Sadak Yojana (PMGSY) road project, executed by Yingkiong RWD Division to connect Palling CO HQs with Tuting SDO HQs enroute Jido, Angging, Singging and Palling villages, while Palling is linked to this district HQs by a 61-km PWD road from opposite side.
The formation-cutting up to Palling is expected to be completeby January 31 next. Construction of culverts, CC drains, retaining walls, breast walls, GSB, WBM, and BT is targeted to be complete by March 31, according to engineers of the contractor.
Jerang lauded engineers, machine operators and workers for the fast pace of work and directed all to strictly adhere to quality.
The PMGSY is a GoI scheme launched in 2000 to provide all-weather road connectivity to unconnected rural habitations. This is a poverty reduction strategy by improving socio-economic condition of rural areas by linking to larger networks with proper infrastructures. (DIPRO)
