TEZU, March 31: Tezu-Sunpura MLA Dr. Mohesh Chai, who along with SDO Sotailum Bellai, inspected ongoing construction of bridge over Paya river to assess the pace and quality of work, being executed under the Pradhan Mantri Gram Sadak Yojana (PMGSY) Phase III, sought quality work fromexecuting agency as well as given deadline.
The 193.08-meter span RCC composite bridge with BUG girder on road from Paya to Bhekuliang. This is one of the longest bridges being built under the PMGSY in Arunachal Pradesh. A similar bridge of the same span has been completed over Khampai River in Wakro circle.(DIPRO)
