Kavach & Gajraj technology in offing: Vaishnaw

India’s bullet train dream to be a reality soon

Beyond the Horizon

By Pradeep Kumar

India’s ambitious bullet train project is progressing swiftly and remains on track to become a reality soon, reassured Railway Minister Ashwini Vaishnaw during the ‘News18 India Chaupal,’ a platform for political parties, lawmakers and policymakers to discuss their strategies ahead of the general elections.

Vaishnaw emphasized the rapid progress of work on the bullet train, expressing confidence that the dream of having a high-speed rail network in India will soon be realized.

Vaishnaw has already gone on record saying that first bullet train, a 50-km stretch between Bilimora and Surat in Gujarat, would be completed by August 2026.

Updating on overhauling of the country’s rail network and services, he had hinted about Kavach system, an indigenously developed warning system to guard against on-track collisions.

However, he also highlighted efforts to enhance the capacity of Ayodhya railway station, aiming to accommodate three crore devotees annually for darshan of Ram Lala.

The minister also affirmed Prime Minister Modi’s commitment to delivering on his promises as the PM has accomplished what he had promised, like 1,318 railway stations have been identified for development or redevelopment under the Amrit Bharat Station Scheme (ABSS). He also gave details of the Aastha Special train from Andaura to Ayodhya Dham which was flagged off on February 5 last.

The minister’s comments were part of a larger discussion on political strategies ahead of upcoming Lok Sabha elections as he expressed confidence in PM Modi’s hat trick guarantee of victories. In a broader context, Vaishnaw provided insights into achievements of the Indian Railways, including its financial performance.

Indian Railways despite challenges posed by COVID-19 pandemic has achieved highest total revenue of ₹2,40,177 crore in 2022-23 fiscal year with an operating ratio of 98.10%. He also highlighted ongoing efforts to address passenger needs and improve accommodations with measures, like introducing new services, extending existing ones and augmenting load capacities.

Vaishnaw mentioned that the Indian Railways, with over 70 million users, is undertaking systematic timetable rationalization efforts in collaboration with IIT Bombay. This initiative aims to enhance passenger safety by establishing maintenance corridor blocks and reducing conflicts in the existing timetable.

Gajraj technology to stop collisions between elephants and trains and building more tracks to better connect different parts of the country would also be implemented, Vaishnaw had informed.

Total 186 elephants were killed after being hit by trains across India between 2009-10 and 2020-21, according to Union Ministry of Environment, Forest and Climate Change report. After an elephant died on being hit by train in Walayar reserve forest between Kanjikode and Walayar stations in Kerala, it was reported in October 2022 more than 25 elephants were killed in last three decades. Total 36 elephants have died in Odisha in the last 10 years as reported on 21.05.22. This means the Ministry’s report may not be right.

Kavach is an indigenously developed Automatic Train Protection (ATP) system by the Research Design and Standards Organisation (RDSO) in collaboration with the Indian industry. It is a state-of-the-art electronic system with Safety Integrity Level-4 (SIL-4) standards. It is meant to provide protection by preventing trains to pass the signal at Red (which marks danger) and avoid collision. It activates the train’s braking system automatically if the driver fails to control the train as per speed restrictions. In addition, it prevents the collision between two locomotives equipped with functional Kavach systems. The system also relays SoS messages during emergency situations. An added feature is the centralised live monitoring of train movements through the Network Monitor System. ‘Kavach’ is one of the cheapest, SIL-4 certified technologies where the probability of error is 1 in 10,000 years.

In fact on 02.06.23, three trains had collided at Bahanaga Railway station in Balasore district of Odisha. This was India’s one of the deadliest railway crash killing 296 people and leaving more than 1,200 others injured. The Coromandel Express had entered the passing loop instead of the main line at full speed and collided with a goods train and its 21 coaches derailed, three of which had collided with the oncoming SMVT Bengaluru-Howrah Superfast Express on the adjacent track.

West Bengal Chief Minister Mamata Banarje, who as Railyway Minister had introduced implementation of Kavach system, during her visit to Bahanaga had questioned Vaishnaw why the system was not implemented across India. Kavach was deployed on 1,465-km and 139 locomotives, including electric multiple unit rakes on South Central Railway till August 2023.

Appreciably, Indian Railways has woken up to implement the system to prevent train collision in future and according to sources tenders for its implementation have been awarded  recently for Delhi, Mumba-Delhi and Howrah corridors, covering approximately 3,000 km.

It may be recalled that on 20.08.95, Delhi-bound Purushottam Express had collided with stationary Kalindi Express near Firozabad in Uttar Pradesh killing around 358 people, though some sources estimate the at more than over 400 deaths while on 02.08.1999, two trains (Avadh Assam Express from New Delhi and Brahmaputra Mail) carrying about 2,500 people had collided at remote Gaisal station in West Bengal on same track due to a signaling error, as under the impact of their combined speeds the trains exploded killing at least 285 people to be considered the deadliest rail disaster worldwide. Why Kavach system was not implemented is an intriguing question?

Though India had recorded its biggest train tragedy and second in the world when a passenger train carrying more than 800 passengers while crossing a bridge had fallen into Bagmati River in Bihar on 06.06.1981 killing more than 750 passengers, but that was not a collision.

Indian Railways, founded on 12th September 1837, is the world’s ninth-largest employer and India’s second largest employer with more than 1.2 million employees. As of 2023, it manages the fourth largest railway stations by size with a running track length of 104,647-km and route length of 68,426-km of which 60,451-km is electrified. (With agency inputs)

Related posts